News

PCB design service process

2019-10-08 11:46:52 18

Shenzhen xinsheng electronic technology co., ltd. is a professional in electronic product design (layout wiring design) PCB design company, mainly to undertake multilayer, high-density PCB design board business. With an average of more than 10 years of experience in PCB design team, can skillfully use mainstream PCB design software in the market, professional and efficient communication to ensure the progress of PCB design, help you early to seize the market opportunity!

MetInfo enterprise content manager system | MetInfo CMS

PCB design business:

Communication product circuit board design

GSM/GPRS, switches, RF equipment, etc

Digital/digital product circuit board design

Set-top box, HDTV, digital camera, video camera, etc

Security product circuit board design

Video monitoring, intercom and so on

PC and related product circuit board design

MB, NB, SERVER motherboard and various industrial control board CARDS

PCB design needs to provide information:

1. Schematic diagram: complete electronic document format of correct netlist can be generated;

2. Mechanical size: provide the specific location and direction identification of the positioning device, as well as the identification of the specific height limit position area;

3. BOM list: mainly to confirm and check the package information specified on the schematic diagram of the device;

4. Wiring guide: description of specific requirements for special signals, as well as design requirements for impedance, lamination, etc.

PCB design software commonly used by our company:

Allegro, PADS, Protel, ORCAD, AD, PADS_LOGIC, etc.

PS: we can convert ORCAD format according to the PDF schematic diagram provided by the customer, and then import the network list.

PCB design regular delivery date:

The schematic diagram determines that the design cycle based on the device package completion is as follows:

Layer number design cycle

2 layers 2-3 working days

4 layers 4-5 working days

6 layers 6-7 working days

8 layers 7-8 working days

10 layers 10-12 working days